Camp Brook Storage Basin Rack #12 - Water & Wastewater

Camp Brook Storage Basin Rack #12

Camp Brook Storage Basin Rack #12

This project involves constructing a 6.3 million gallon Combined Sewer Overflow Storage Basin adjacent to the exciting Rack 12 sewer outfall. The basin will be equipped with a combination manual and automated flushing/washdown system, flow valving and metering controls, and floatable screening. Included with this project is a new access drive, operations building, site lighting, fencing, storm and sanitary sewer, river realignment and bank stabilization, tree clearing, site grading, and post construction storm water management construction. GSI is providing construction management services. As well as, inspections and value engineering.

Location

Akron, OH

Project Cost

$26.8 Million

Delivery Method

Construction Management

Services Provided

  • Construction Management
  • Inspections
  • Value Engineering

Year Completed

Ongoing

Owner and Client

City of Akron